Multi building public building with StiroFert girder grill construction with grid axis (8m, 10m, 12m or even 15m)
- It has small mass
and it is very rigid, so it is highly recommended for areas with earthquakes
- With no harmful effects for health
- fire resistant
- Prefabricated floor construction, economically proved

Cotter, profile built in during concreting. Cutter can be seen at the lower side of construction and it points the place when shorts is built in the process of mounting..
|
Details of construction used for mounting gypsum plates. Core plates are built in during concreting, one side of galvanized „L“ profiles are set on cores, notched in polystyrene, while other, horizontal side is used for mounting gypsum plates. There is an other whey. You can use plastic net and polystyrene glue.
|
|
.